SRM Southern Pit Geometry Optimisation Project

Completed:  2020 (inclusive of Stages 1 and 2) Project Value:  $17.8 M   Creek Diversion project to allow expansion of an existing open-cut pit. Included:   [no_icons icon_pack="font_awesome" fa_icon="fa-arrow-right " fe_icon="" fa_size="fa-lg" custom_size="" type="normal" rotated_shape="no" border_radius="" shape_size="" icon_color="#003054" position="" border_color="" border_width="" background_color="" hover_icon_color="" hover_border_color="" hover_background_color="" margin="" icon_animation="" icon_animation_delay="" back_to_top_icon="yes" link="" anchor_icon="" target="_self"] Construction of a new low-flow channel for the diverted creek   [no_icons icon_pack="font_awesome" fa_icon="fa-arrow-right " fe_icon="" fa_size="fa-lg" custom_size="" type="normal" rotated_shape="no" border_radius="" shape_size="" icon_color="#003054" position="" border_color="" border_width="" background_color="" hover_icon_color="" hover_border_color="" hover_background_color="" margin="" icon_animation="" icon_animation_delay="" back_to_top_icon="yes" link="" anchor_icon="" target="_self"] Topsoil strip, regrading, topsoil spread and revegetation to create a new floodplain   [no_icons icon_pack="font_awesome" fa_icon="fa-arrow-right " fe_icon="" fa_size="fa-lg" custom_size="" type="normal" rotated_shape="no" border_radius="" shape_size="" icon_color="#003054" position="" border_color="" border_width="" background_color="" hover_icon_color="" hover_border_color="" hover_background_color="" margin="" icon_animation="" icon_animation_delay="" back_to_top_icon="yes" link="" anchor_icon="" target="_self"] Construction of levees to contain the diverted creek in flood events [no_icons icon_pack="font_awesome" fa_icon="fa-arrow-right " fe_icon="" fa_size="fa-lg" custom_size="" type="normal" rotated_shape="no" border_radius="" shape_size="" icon_color="#003054" position="" border_color="" border_width="" background_color="" hover_icon_color="" hover_border_color="" hover_background_color="" margin="" icon_animation="" icon_animation_delay="" back_to_top_icon="yes" link=""...

Read More

Coolibah Pit Restart Phase 1

Completed:  2020 Project Value:  $18 M   Enabling works to de-water a flooded pit. Works include: [no_icons icon_pack="font_awesome" fa_icon="fa-arrow-right " fe_icon="" fa_size="fa-lg" custom_size="" type="normal" rotated_shape="no" border_radius="" shape_size="" icon_color="#003054" position="" border_color="" border_width="" background_color="" hover_icon_color="" hover_border_color="" hover_background_color="" margin="" icon_animation="" icon_animation_delay="" back_to_top_icon="yes" link="" anchor_icon="" target="_self"] Transport, welding and installation of approximately 17km of DN630 HDPE Pipelines, inclusive of road and creek crossings [no_icons icon_pack="font_awesome" fa_icon="fa-arrow-right " fe_icon="" fa_size="fa-lg" custom_size="" type="normal" rotated_shape="no" border_radius="" shape_size="" icon_color="#003054" position="" border_color="" border_width="" background_color="" hover_icon_color="" hover_border_color="" hover_background_color="" margin="" icon_animation="" icon_animation_delay="" back_to_top_icon="yes" link="" anchor_icon="" target="_self"] Construction of a 58ML staging dam, including a clay liner and gypsum treatment of dispersive local soils [no_icons icon_pack="font_awesome" fa_icon="fa-arrow-right " fe_icon="" fa_size="fa-lg" custom_size="" type="normal" rotated_shape="no" border_radius="" shape_size="" icon_color="#003054" position="" border_color="" border_width="" background_color="" hover_icon_color="" hover_border_color="" hover_background_color="" margin="" icon_animation="" icon_animation_delay="" back_to_top_icon="yes" link="" anchor_icon="" target="_self"] Construction of concrete pump pads and associated electrical works ...

Read More

Autonomous Haulage Works

Completed:  2020 Project Value:  Ongoing   Construction of haul roads, fuel farms, pads and other infrastructure to support the roll-out of autonomous trucks at a major coal mine.   [no_icons icon_pack="font_awesome" fa_icon="fa-arrow-right " fe_icon="" fa_size="fa-lg" custom_size="" type="normal" rotated_shape="no" border_radius="" shape_size="" icon_color="#003054" position="" border_color="" border_width="" background_color="" hover_icon_color="" hover_border_color="" hover_background_color="" margin="" icon_animation="" icon_animation_delay="" back_to_top_icon="yes" link="" anchor_icon="" target="_self"] Fill material dumped out by the mine’s pre-strip fleet and construction carried out in approximately 1m lifts. [no_icons icon_pack="font_awesome" fa_icon="fa-arrow-right " fe_icon="" fa_size="fa-lg" custom_size="" type="normal" rotated_shape="no" border_radius="" shape_size="" icon_color="#003054" position="" border_color="" border_width="" background_color="" hover_icon_color="" hover_border_color="" hover_background_color="" margin="" icon_animation="" icon_animation_delay="" back_to_top_icon="yes" link="" anchor_icon="" target="_self"] D11 dozers utilized for bulk pushing and track rolling [no_icons icon_pack="font_awesome" fa_icon="fa-arrow-right " fe_icon="" fa_size="fa-lg" custom_size="" type="normal" rotated_shape="no" border_radius="" shape_size="" icon_color="#003054" position="" border_color="" border_width="" background_color="" hover_icon_color="" hover_border_color="" hover_background_color="" margin="" icon_animation="" icon_animation_delay="" back_to_top_icon="yes" link="" anchor_icon="" target="_self"] Tractor-drawn Impact Roller for deep compaction of existing subgrade and rubblisation of fill material [no_icons icon_pack="font_awesome" fa_icon="fa-arrow-right " fe_icon="" fa_size="fa-lg" custom_size="" type="normal" rotated_shape="no" border_radius="" shape_size="" icon_color="#003054" position="" border_color=""...

Read More

North East Sediment Dam

Completed:  05/2018 – 03/2019 Project Value:  $2,898,000     [no_icons icon_pack="font_awesome" fa_icon="fa-arrow-right " fe_icon="" fa_size="fa-lg" custom_size="" type="normal" rotated_shape="no" border_radius="" shape_size="" icon_color="#003054" position="" border_color="" border_width="" background_color="" hover_icon_color="" hover_border_color="" hover_background_color="" margin="" icon_animation="" icon_animation_delay="" back_to_top_icon="yes" link="" anchor_icon="" target="_self"] A 348 ML valley dam in accordance with GRM erosion and sediment control plan. The dam will capture and treat runoff from the north-eastern sediment dams’ catchment (430Ha) [no_icons icon_pack="font_awesome" fa_icon="fa-arrow-right " fe_icon="" fa_size="fa-lg" custom_size="" type="normal" rotated_shape="no" border_radius="" shape_size="" icon_color="#003054" position="" border_color="" border_width="" background_color="" hover_icon_color="" hover_border_color="" hover_background_color="" margin="" icon_animation="" icon_animation_delay="" back_to_top_icon="yes" link="" anchor_icon="" target="_self"] Bulk earthworks for dam embankment and drainage upgrade   [no_icons icon_pack="font_awesome" fa_icon="fa-arrow-right " fe_icon="" fa_size="fa-lg" custom_size="" type="normal" rotated_shape="no" border_radius="" shape_size="" icon_color="#003054" position="" border_color="" border_width="" background_color="" hover_icon_color="" hover_border_color="" hover_background_color="" margin="" icon_animation="" icon_animation_delay="" back_to_top_icon="yes" link="" anchor_icon="" target="_self"] Construction of a release structure [no_icons icon_pack="font_awesome" fa_icon="fa-arrow-right " fe_icon="" fa_size="fa-lg" custom_size="" type="normal" rotated_shape="no" border_radius="" shape_size="" icon_color="#003054" position="" border_color="" border_width="" background_color="" hover_icon_color="" hover_border_color="" hover_background_color="" margin="" icon_animation="" icon_animation_delay="" back_to_top_icon="yes" link="" anchor_icon="" target="_self"] Sediment traps for maintenance and desilting of...

Read More

Tailings Dam Raise

Project Timing:  05/2018 – 03/2019 Project Value:  $15,500,000 Client details:  BHP (Coal Projects)   [no_icons icon_pack="font_awesome" fa_icon="fa-arrow-right " fe_icon="" fa_size="fa-lg" custom_size="" type="normal" rotated_shape="no" border_radius="" shape_size="" icon_color="#003054" position="" border_color="" border_width="" background_color="" hover_icon_color="" hover_border_color="" hover_background_color="" margin="" icon_animation="" icon_animation_delay="" back_to_top_icon="yes" link="" anchor_icon="" target="_self"] Wall raise of the existing embankments including installation of a sand filter and working platform. [no_icons icon_pack="font_awesome" fa_icon="fa-arrow-right " fe_icon="" fa_size="fa-lg" custom_size="" type="normal" rotated_shape="no" border_radius="" shape_size="" icon_color="#003054" position="" border_color="" border_width="" background_color="" hover_icon_color="" hover_border_color="" hover_background_color="" margin="" icon_animation="" icon_animation_delay="" back_to_top_icon="yes" link="" anchor_icon="" target="_self"] Construction of an inspection track on the toe and access ramps for the Southern and Western embankments. [no_icons icon_pack="font_awesome" fa_icon="fa-arrow-right " fe_icon="" fa_size="fa-lg" custom_size="" type="normal" rotated_shape="no" border_radius="" shape_size="" icon_color="#003054" position="" border_color="" border_width="" background_color="" hover_icon_color="" hover_border_color="" hover_background_color="" margin="" icon_animation="" icon_animation_delay="" back_to_top_icon="yes" link="" anchor_icon="" target="_self"] Construction of an embankment and inspection track on the Northern Embankment. [no_icons icon_pack="font_awesome" fa_icon="fa-arrow-right " fe_icon="" fa_size="fa-lg" custom_size="" type="normal" rotated_shape="no" border_radius="" shape_size="" icon_color="#003054" position="" border_color="" border_width="" background_color="" hover_icon_color="" hover_border_color="" hover_background_color="" margin="" icon_animation="" icon_animation_delay="" back_to_top_icon="yes" link="" anchor_icon=""...

Read More

Kemmis 2 Early Works

Project Timing:  05/2017 – 12/2017 Project Value:  $7,000,000 Client details:  BHP (Coal Projects)     Early Works for establishment of the Kemmis Pit Stage 2 Project (K2), a northern boxcut extension of the existing Kemmis Pit Stage 1 (K1N) development.   [no_icons icon_pack="font_awesome" fa_icon="fa-arrow-right " fe_icon="" fa_size="fa-lg" custom_size="" type="normal" rotated_shape="no" border_radius="" shape_size="" icon_color="#003054" position="" border_color="" border_width="" background_color="" hover_icon_color="" hover_border_color="" hover_background_color="" margin="" icon_animation="" icon_animation_delay="" back_to_top_icon="yes" link="" anchor_icon="" target="_self"] Clearing and grubbing of 133ha to allow access to areas for box cut strips, spoil dumps, topsoil stockpiles, northern and southern mine water dams and landholder, mine and back access roads. [no_icons icon_pack="font_awesome" fa_icon="fa-arrow-right " fe_icon="" fa_size="fa-lg" custom_size="" type="normal" rotated_shape="no" border_radius="" shape_size="" icon_color="#003054" position="" border_color="" border_width="" background_color="" hover_icon_color="" hover_border_color="" hover_background_color="" margin="" icon_animation="" icon_animation_delay="" back_to_top_icon="yes" link="" anchor_icon="" target="_self"] Topsoil stripping (166,000 m3) of box cut strips, spoil dumps and landholder, mine and back access roads.   [no_icons icon_pack="font_awesome" fa_icon="fa-arrow-right " fe_icon="" fa_size="fa-lg" custom_size="" type="normal" rotated_shape="no" border_radius="" shape_size="" icon_color="#003054" position="" border_color="" border_width="" background_color="" hover_icon_color="" hover_border_color="" hover_background_color="" margin=""...

Read More

Tailings Dam Raise

Project Timing:  09/2016 – 05/2017 Project Value:  $6,700,000 Client details:  BHP (Coal Projects)     [no_icons icon_pack="font_awesome" fa_icon="fa-arrow-right " fe_icon="" fa_size="fa-lg" custom_size="" type="normal" rotated_shape="no" border_radius="" shape_size="" icon_color="#003054" position="" border_color="" border_width="" background_color="" hover_icon_color="" hover_border_color="" hover_background_color="" margin="" icon_animation="" icon_animation_delay="" back_to_top_icon="yes" link="" anchor_icon="" target="_self"] Upstream and downstream raises to perimeter embankments and centreline raise of an internal decant access embankment [no_icons icon_pack="font_awesome" fa_icon="fa-arrow-right " fe_icon="" fa_size="fa-lg" custom_size="" type="normal" rotated_shape="no" border_radius="" shape_size="" icon_color="#003054" position="" border_color="" border_width="" background_color="" hover_icon_color="" hover_border_color="" hover_background_color="" margin="" icon_animation="" icon_animation_delay="" back_to_top_icon="yes" link="" anchor_icon="" target="_self"] Construct a new, raised emergency overflow external spillway [no_icons icon_pack="font_awesome" fa_icon="fa-arrow-right " fe_icon="" fa_size="fa-lg" custom_size="" type="normal" rotated_shape="no" border_radius="" shape_size="" icon_color="#003054" position="" border_color="" border_width="" background_color="" hover_icon_color="" hover_border_color="" hover_background_color="" margin="" icon_animation="" icon_animation_delay="" back_to_top_icon="yes" link="" anchor_icon="" target="_self"] Reinstatement of tailings delivery pipelines and discharge spigots along the crest of the raised eastern and southern perimeter embankments. [no_icons icon_pack="font_awesome" fa_icon="fa-arrow-right " fe_icon="" fa_size="fa-lg" custom_size="" type="normal" rotated_shape="no" border_radius="" shape_size="" icon_color="#003054" position="" border_color="" border_width="" background_color="" hover_icon_color="" hover_border_color="" hover_background_color="" margin="" icon_animation="" icon_animation_delay="" back_to_top_icon="yes" link="" anchor_icon=""...

Read More

Water Dam – Dividing Embankment

Project Timing:  10/2016 – 01/2017 Project Value:  $1,200,000 Client details:  BHP (Goonyella Riverside – Engineering)     Construction of a 2km dividing embankment to an existing dam, including a spillway. Installation of 4km of HDPE pipeline.   [no_icons icon_pack="font_awesome" fa_icon="fa-arrow-right " fe_icon="" fa_size="fa-lg" custom_size="" type="normal" rotated_shape="no" border_radius="" shape_size="" icon_color="#003054" position="" border_color="" border_width="" background_color="" hover_icon_color="" hover_border_color="" hover_background_color="" margin="" icon_animation="" icon_animation_delay="" back_to_top_icon="yes" link="" anchor_icon="" target="_self"] Clearing and grubbing works and topsoil strip of works area and borrow locations. [no_icons icon_pack="font_awesome" fa_icon="fa-arrow-right " fe_icon="" fa_size="fa-lg" custom_size="" type="normal" rotated_shape="no" border_radius="" shape_size="" icon_color="#003054" position="" border_color="" border_width="" background_color="" hover_icon_color="" hover_border_color="" hover_background_color="" margin="" icon_animation="" icon_animation_delay="" back_to_top_icon="yes" link="" anchor_icon="" target="_self"] Embankment foundation stripping and key trench excavation. [no_icons icon_pack="font_awesome" fa_icon="fa-arrow-right " fe_icon="" fa_size="fa-lg" custom_size="" type="normal" rotated_shape="no" border_radius="" shape_size="" icon_color="#003054" position="" border_color="" border_width="" background_color="" hover_icon_color="" hover_border_color="" hover_background_color="" margin="" icon_animation="" icon_animation_delay="" back_to_top_icon="yes" link="" anchor_icon="" target="_self"] Placement and compaction of fill to a new trapezoidal [no_icons icon_pack="font_awesome" fa_icon="fa-arrow-right " fe_icon="" fa_size="fa-lg" custom_size="" type="normal" rotated_shape="no" border_radius="" shape_size="" icon_color="#003054" position="" border_color="" border_width="" background_color="" hover_icon_color="" hover_border_color="" hover_background_color=""...

Read More

ROM Bulk Earthworks

Project Timing:  04/2016 – 08/2017 Project Value:  $2,500,000 Client details:  BHP (Coal Projects)     Clear and grub and topsoil strip of 20 Ha site   Bulk earthworks construction (rock fill) of a ROM Pad utilizing dozer push of site-blasted material, including:   [no_icons icon_pack="font_awesome" fa_icon="fa-arrow-right " fe_icon="" fa_size="fa-lg" custom_size="" type="normal" rotated_shape="no" border_radius="" shape_size="" icon_color="#003054" position="" border_color="" border_width="" background_color="" hover_icon_color="" hover_border_color="" hover_background_color="" margin="" icon_animation="" icon_animation_delay="" back_to_top_icon="yes" link="" anchor_icon="" target="_self"] Drainage infrastructure [no_icons icon_pack="font_awesome" fa_icon="fa-arrow-right " fe_icon="" fa_size="fa-lg" custom_size="" type="normal" rotated_shape="no" border_radius="" shape_size="" icon_color="#003054" position="" border_color="" border_width="" background_color="" hover_icon_color="" hover_border_color="" hover_background_color="" margin="" icon_animation="" icon_animation_delay="" back_to_top_icon="yes" link="" anchor_icon="" target="_self"] Haul roads  [no_icons icon_pack="font_awesome" fa_icon="fa-arrow-right " fe_icon="" fa_size="fa-lg" custom_size="" type="normal" rotated_shape="no" border_radius="" shape_size="" icon_color="#003054" position="" border_color="" border_width="" background_color="" hover_icon_color="" hover_border_color="" hover_background_color="" margin="" icon_animation="" icon_animation_delay="" back_to_top_icon="yes" link="" anchor_icon="" target="_self"] Excavations for Dam(s) [no_icons icon_pack="font_awesome" fa_icon="fa-arrow-right " fe_icon="" fa_size="fa-lg" custom_size="" type="normal" rotated_shape="no" border_radius="" shape_size="" icon_color="#003054" position="" border_color="" border_width="" background_color="" hover_icon_color="" hover_border_color="" hover_background_color="" margin="" icon_animation="" icon_animation_delay="" back_to_top_icon="yes" link="" anchor_icon="" target="_self"] Hardstands  ...

Read More

Barrett’s Creek Levee Bank Project

Project Timing:  Aug 2016–  Nov 2016 Project Value:  $1,700,000 Client details:  BHP (Coal Projects)   Relocation of CHPP raw water supply line including:   [no_icons icon_pack="font_awesome" fa_icon="fa-arrow-right " fe_icon="" fa_size="fa-lg" custom_size="" type="normal" rotated_shape="no" border_radius="" shape_size="" icon_color="#003054" position="" border_color="" border_width="" background_color="" hover_icon_color="" hover_border_color="" hover_background_color="" margin="" icon_animation="" icon_animation_delay="" back_to_top_icon="yes" link="" anchor_icon="" target="_self"] clearing and grubbing of new pipe alignment; [no_icons icon_pack="font_awesome" fa_icon="fa-arrow-right " fe_icon="" fa_size="fa-lg" custom_size="" type="normal" rotated_shape="no" border_radius="" shape_size="" icon_color="#003054" position="" border_color="" border_width="" background_color="" hover_icon_color="" hover_border_color="" hover_background_color="" margin="" icon_animation="" icon_animation_delay="" back_to_top_icon="yes" link="" anchor_icon="" target="_self"] isolation and de-watering; [no_icons icon_pack="font_awesome" fa_icon="fa-arrow-right " fe_icon="" fa_size="fa-lg" custom_size="" type="normal" rotated_shape="no" border_radius="" shape_size="" icon_color="#003054" position="" border_color="" border_width="" background_color="" hover_icon_color="" hover_border_color="" hover_background_color="" margin="" icon_animation="" icon_animation_delay="" back_to_top_icon="yes" link="" anchor_icon="" target="_self"] relocation;  [no_icons icon_pack="font_awesome" fa_icon="fa-arrow-right " fe_icon="" fa_size="fa-lg" custom_size="" type="normal" rotated_shape="no" border_radius="" shape_size="" icon_color="#003054" position="" border_color="" border_width="" background_color="" hover_icon_color="" hover_border_color="" hover_background_color="" margin="" icon_animation="" icon_animation_delay="" back_to_top_icon="yes" link="" anchor_icon="" target="_self"] recommissioning;   Removal/demolition of defunct pipework;   Levee bank construction:   [no_icons icon_pack="font_awesome" fa_icon="fa-arrow-right " fe_icon="" fa_size="fa-lg" custom_size="" type="normal" rotated_shape="no" border_radius="" shape_size="" icon_color="#003054" position="" border_color="" border_width="" background_color=""...

Read More